Bournville Gardens Extracare Charitable Trust
1
2
3
4
5
6
7
8
9
10
11
12
Concept Ceiling Plate and Cross Strap
Cross section through ceiling
A
A
Cross Strap and aprox Ceiling Plate
M
L-L ( 1:10 )
30,00 Approx
B
B
Concept detail of Ceiling Strap, Plate and Rods
M ( 1 : 3 )
C
C
360,00
350,00
350,00
N
Rod
N ( 2:1 )
D
D
Plasterboard
Ceiling Strap to be secured flat to plasterboard with sufficient length of rods to mount safely with nuts and washers. Rods also should be short enough to not interfere with ceiling plate when secured into place.
Ceiling Plate Ceiling Strap
P 1200 Approx
Luminaire Positioning &Artistic Impression
E
E
Plan viewof ceiling plate and ceiling strap. Ceiling strapwill have eight fixing points two on each arm. Rods to hang down froma secondary structure to secure fitting in place. Holes will be approximately 2mm larger than rods to allowslight alterations to position of fitting. Washers and nuts to secure strap into place.
F
F
G
G
Concept of additional steel structure to support 80-90 KG chandelier.
Positioning of middle chandelier should be centred evenly between the structural columns. The two other chandelier either side should be centred evenly between the columns and the perimeter walkways.
Date
Date
Designed by
Checked by
Approved by
AndyMoore
07/11/2014
Sheet@ A1
H
H
Concept Ceiling Plate + Strap
Edition
1 / 1 Sheet
Retirement Village
1
2
3
4
5
6
7
8
9
10
11
12
Made with FlippingBook - professional solution for displaying marketing and sales documents online